Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 60000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
New SHANTUI SD42-3 420HP Big Construction Machine Bulldozer
The planetary power shift transmission with forced lubrication and the hydraulically assisted steering system achieve light operations of the machine and feature high transmission power and high productivity.
The closed system maintains the water tank pressure at specific value and can improve the evaporation temperature and heat dissipation efficiency of coolant.
The fan is driven by the engine to enhance the cooling effect with forced air supply.
The mainstream 14MPa working hydraulic system is adopted to remarkably reduce the malfunction rate of hydraulic units, featuring high operation stability and overload protection function.
The application of water-proof connectors, new relays, and injection molded instruments can effectively eliminate the electric system malfunctions. The instrument box integrates the A/C, electric devices, and instruments, featuring beautiful appearance and high grade.
The full box-type main frame adopts full box-type integral structure welded from steel plates and is welded together with the real axle housing to realize high carrying capacity against impact load and bending moment and the high quality welds guarantee the life cycle of the main frame.
The swing type balance beam suspension structure with splayed beam is connected with the frame and traveling system to transmit the working load and impact load to the main frame during working, which effectively improves the stability of small-sized bulldozers under complicated working conditions.
The standard straight tilting blade features powerful cutting force and the three-shank ripper can be used for the ripping of clay and frozen earth, featuring high working efficiency and super-strong penetrating force.
Tio Zhao
+86 17860480552
Engine | Model & type | A19-C525 , In-line, water-cooled, 4-cycle, turbo charged, intercooled, direct injection | ||
Horsepower | Gross power: 340/450/2000 kW/HP/rpm // Net power: 313/450/2000 kW/HP/rpm |
|||
Number of cylinders | 6-150 x 150 mm (bore x stroke) | |||
Piston displacement | 15.9 L | |||
Operating weight | 54.5 t (Ripper included) | |||
Power transmission system |
Torque converter | 3-element, 1 stage, 1 phase | ||
Transmission | Planetary gear, multi-disc clutch,hydraulically connected, forced lubrication | |||
Main drive | Spiral bevel gear, splash lubrication | |||
Steering clutch | Wet, multi-disc, spring loaded,hydraulically separated, hydraulic control | |||
Steering brake | Wet, floating band, hydraulic control | |||
Final drive | 1-stage spur gear,1-stage planetary speed reduction, splash lubrication | |||
Travel speed | Gear | 1st | 2nd | 3rd |
Forward | 0~3.7 km/h | 0~6.8 km/h | 0~12.2 km/h | |
Reverse | 0~4.4 km/h | 0~8.2 km/h | 0~14.8 km/h | |
Undercarriage system |
Type | K type elastic suspended structure,connection with frame pivot | ||
Gradeability | 30° | |||
Stability | 35° | |||
Track gauge | 2260 mm | |||
Ground length | 3560 mm | |||
Number of carrier rollers | 2 (each side) | |||
Number of track rollers | 7 (each side) | |||
Number of track shoes | 41 (each side) | |||
Track type | Link master, seal, lubricated type | |||
Width of track shoes | 610 mm | |||
Pitch | 260.35 mm | |||
Hydraulic System |
Maximum pressure | 14 MPa | ||
Pump type | Gear pump | |||
Discharge | 243 L/min | |||
Bore of working cylinder × no. |
110 mm × 2 | |||
Blade | Blade Type | Semi-U blade | ||
Dozing capacity | 16 m3 | |||
Blade width | 4314 x 1875 mm | |||
Max. drop below ground of blade |
700 mm | |||
Maximum lift height | 1545 mm | |||
Riipper (Optional) |
Ripper type | Single-shank ripper | ||
Ripping depth of ripper | 1400 mm | |||
Lifting height of ripper | 1130 mm |