Customization: | Available |
---|---|
After-sales Service: | Online Support |
Warranty: | 1 Year Warranty |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specifications | CDM6150 | CDM6150E | |
Engine | Model | 4BTAA3.9-C (Stage IIA) | QSB4.5 (Stage IIIA) |
Rated power | 86 kW (117hp) /2200 rpm | 90 kW (122hp) /2200 rpm | |
Max. torque | 424 N.m/1600 rpm | 489 N.m/1500 rpm | |
Bore × Stroke | 102 mm×120 mm | 107 mm×124 mm | |
Displacement | 3.9 L | 4.5 L | |
Comment | Maintain the rated power at 2300m elevation. | ||
Operating weight | Summary | Operating weight:14000kg | |
The operating weight includes the weight of 4600 mm standard boom,2500 mm standard arm,0.56m3 standard bucket, 500 mm track shoes, lubricating oil, coolant, the full diesel oil tank and the rest standard configuration units.. | |||
Ground pressure | 45 kPa | ||
Fluid capacity | Fuel tank | 270 L | |
Cooling system | 23 L | ||
Engine oil | 14 L | ||
Swing drive unit | 1.8 L | ||
Traveling gear | 2×2.5 L | ||
Hydraulic oil tank | 159 L | ||
Swing mechanism | Summary | High torque plunger motor and 2-stage planetary reducer drive. Brake inside loading motor is applied by spring and released by hydraulic unit. The automatic braking is available when the swing control lever is in neutral position. | |
Swing speed | 11.9 rpm | ||
Travel drive | Summary | The integrated 2-speed plunger hydraulic motor and reducer drive, motor and hydraulic pipeline are arranged inside the track frame to prevent the damage caused by the rugged road surface. The motor inside is provided with the service brake and shock absorption valve to ensure the smooth running and stop and the reliable braking. | |
Taveling speed | 3.34 -5.5 km/h |