Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1000000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Efficiency
· Large core parameters such as high torque and crowd force; fast line speed of main rope to ensure high drilling efficiency in hard soil layer; it is suitable for overpass, high-speed rail, large buildings and other large hole foundation fields.
Full Stroke Crowd
· Adopt a winch crowd system with long stroke, fast crowding, and rotary drive display function, suitable for all casing
construction in the beach, pebble and backfill formation.
Economy and Energy Saving
· Power optimization control technology is adopted to distribute power in real-time with the smooth and fast response of composite action; moreover, it has high fuel efficiency and low comprehensive fuel consumption.
Step Drum
· Adopt step drum structure with a single layer to realize no crushing, no wear, and increase the service life of wire rope by
35%.
Intelligent Upgrade
· HD touch screen, 3ms refresh frequency, smooth animation display.
Convenience
· The rotary drive key bar is exposed for easy service and replacement; the main winching wire rope is fixed by a wedge, which is easy to disassemble and assemble. Some lubrication points are exposed for easy service.
Model
|
SR285M-V
|
|
Crowd Force
|
265KN
|
|
Line Pull
|
355kN
|
|
Stroke
|
19000MM
|
|
Bade Engine
|
TAD1383VE
|
|
Emission Regulation
|
Stage V
|
|
Engine Power
|
345/1800 kW/rpm
|
|
Lifting Capacity
|
325kN
|
|
Max. Line Speed
|
70 m/min
|
|
Rope Diameter
|
36mm
|
|
Operating Weight
|
105T
|
|
Overall Height
|
25470 mm
|
|
Transport Height
|
3610mm
|
|
Transport Width
|
3475mm
|
|
Max. Pile Depth
|
94m
|
|
Max. Pile Diameter
|
2200mm
|
|
Rated Output Torque
|
285kN.m
|
|
Rated Speed
|
5-27 rpm
|